Residential electric service, transformer to meter base
Get electric service to your new home
Plain-English guides for owner-builders and DIYers bringing permanent power to a new home, barn or shop: the utility process, underground laterals, overhead masts, meter bases, service wire and grounding. Updated for the 2026 NEC.
A residential electric service runs from the utility's transformer, through a service lateral (underground) or service drop (overhead), to a meter base on the house, then through a main disconnect to the panel. The utility owns the transformer and meter. The customer usually supplies the meter base, conduit, riser and grounding. The 2026 NEC now requires the service disconnect to be outdoors for houses.
Service directory · transformer to meter
- 01How to get electric serviceThe 7 steps from utility application to a live meter.
- 02Who owns the service line?Utility vs. homeowner, from transformer to meter base.
- 03Service size calculatorEstimate your load and see if 200 A is enough.
- 04200 A vs. 400 A serviceWhat changes: meter base, wire, panels and cost.
- 05Underground service lateralTrench depth, conduit, sweeps, risers and pulling.
- 06Overhead service mastService drop clearances, mast height and weatherheads.
- 07Meter base guideMeter socket vs. meter-main, 200 A vs. Class 320.
- 08Service entrance wire sizeNEC 310.12 chart, aluminum vs. copper, URD and SER.
- 09Service groundingGround rods, acorn clamps, conductor size and bonding.
- 102026 NEC service changesOutdoor disconnect, emergency labels and surge protection.
- 11Service parts listEvery part from the transformer pad to the meter base.
What are the parts of a residential electric service?
| Part | What it does | Usually supplied by |
|---|---|---|
| Transformer | Steps distribution voltage down to 120/240 V | Utility |
| Service lateral or drop | Conductors from the transformer to the service point | Utility (varies) |
| Conduit, sweeps and riser | Protect the underground conductors | Customer |
| Meter base (meter socket) | Holds the utility meter and terminates the service conductors | Customer |
| Meter | Measures energy use | Utility |
| Service disconnect | Shuts off all power; outdoors under the 2026 NEC | Customer |
| Grounding electrodes | Ground rods, concrete-encased electrode, bonding | Customer |
Frequently asked questions
Who is responsible for the line from the transformer to the meter?
The utility owns the transformer and the meter. Who owns the service lateral between them depends on the utility. Many utilities, including AEP, supply and own the underground conductors to the meter base, while the customer provides the trench, conduit and meter socket. Some cooperatives and municipal utilities make the customer own the whole lateral. Check your utility's service handbook.
How deep does an underground electric service line need to be?
The NEC minimum cover for PVC conduit is 18 inches and for direct-burial cable is 24 inches. Your utility can require more for its service lateral. AEP's companies in Ohio, for example, require 30 inches, and some utilities require 36 inches. Use whichever depth is greater.
What size wire is needed for a 200 amp service?
Under NEC Table 310.12 for single-phase dwelling services, a 200-amp service uses 4/0 AWG aluminum or 2/0 AWG copper conductors. Underground laterals commonly use aluminum URD cable such as 4/0-4/0-2/0. If the utility supplies the lateral, it chooses the conductor.
Does the 2026 NEC require an outdoor service disconnect?
Yes, for one- and two-family dwellings. The 2026 NEC deleted Section 230.85 and moved the requirement into 230.70: the service disconnect must be in a readily accessible outdoor location on or within sight of the house. A meter-main combination is the most common way to meet it.
Should I get a 200 amp or 400 amp meter base?
A 200-amp meter base fits most homes. All-electric homes with EV chargers, heat pumps and large shops often need a 400-amp service, which uses a Class 320 meter base rated for 320 amps continuous. Your electrician's load calculation and your utility decide which one you need.