Service size · Comparison
200 amp vs. 400 amp service
A 200-amp service handles most new homes, including many with central air and one EV charger. Choose 400-amp (Class 320) service when a load calculation shows more than about 200 amps, which is common in all-electric homes with electric heat, two EV chargers, a hot tub, a pool or a large shop. A 400-amp service uses a Class 320 meter base feeding two 200-amp panels.
| 200 A service | 400 A (Class 320) | |
|---|---|---|
| Meter base | 200 A socket or meter-main | Class 320 socket, usually two 200 A mains |
| Continuous rating | 200 A | 320 A |
| Aluminum service conductors | 4/0 AWG | 600 kcmil (or parallel sets) |
| Copper service conductors | 2/0 AWG | 400 kcmil |
| Panels | One 200 A panel | Two 200 A panels |
| Typical fit | Gas heat, or all-electric with moderate loads | All-electric with EVs, electric heat, shop, pool or hot tub |
Conductor sizes from NEC Table 310.12 for single-phase dwelling services. Your utility may supply the lateral and choose its size.
What pushes a home over 200 amps?
- Electric resistance heat or heat pump backup strips (10 to 20 kW is common).
- Two Level 2 EV chargers (a 48 A charger alone adds about 11.5 kVA).
- Electric tankless water heaters, which can draw 100 amps or more.
- Hot tubs, pools, welders and shop equipment.
How do you decide?
Your electrician runs a load calculation under NEC 220.82 (renumbered 120.82 in the 2026 NEC). Try our service size calculator for a rough estimate first, then confirm with your electrician and utility. Meter base options are in the meter base guide.
Frequently asked questions
Is 400 amp service really 320 amps?
Yes. Residential 400-amp service uses a Class 320 meter base, rated 320 amps continuous and 400 amps maximum. It usually feeds two 200-amp panels or disconnects.
How many square feet need 400 amp service?
Square footage alone doesn't decide it. A 5,000 sq ft home with gas heat can fit on 200 amps, while a 2,500 sq ft all-electric home with two EV chargers may need 400. The load calculation, which counts heating, cooling and big appliances, decides it.
Can I upgrade from 200 to 400 amps later?
Yes, but it costs much more later: a new meter base, larger service conductors, possibly a new transformer and a utility re-design. If the load calculation is close to 200 amps, installing 400-amp capacity during construction is usually cheaper.
Sources: NFPA 70 (NEC) Table 310.12, 220.82; Skamania PUD, meter bases.